|              Main Page             New Entrance to Camp Randall (PDF)             Camp Randall Suites             Buckingham Club             Varsity Club            |                       2005 Camp Randall Renovation Goals            Transform the fourth oldest college football stadium in the country into a safe, accessible and technologically advanced facility with increased capacity, an intimidating game day atmosphere, and improved customer services within the project budget.             Overall improvements:                          - All existing stadium problems/deficiencies were addressed including safety, customer service, accessibility, capacity and infrastructure.
               - Total seating capacity increased from 76,746 to 80,321.
               - Total square footage increased to 319,000-square feet, including 84,540-square feet that underwent renovation.
               - Restroom capacity was increased for women, from 212 to 463 fixtures, and increased for men, from 445 to 499 fixtures.
               - Accessible ADA seating sightlines were improved, and seating increased from 99 to 292.
               - Concession points of sale were increased from 135 to 157.
               - A pedestrian ramp and seven elevators were added. A wide third level concourse was created that encompasses half the stadium connecting the east and west sides.
                          Other improvements:                          - Expanded and rebuilt eastside concourses on the ground level and third floor; built new fifth-level concourse; increased restrooms, concessions
               - Built 72 suites (capacity 20); 337 premium club seats, centered on 50-yard line on the eighth (top) level; and two levels of 295 club seats (590 total) between the east stadium and Shell
               - Closed in the southeast and southwest corners with new seating, and rebuilt the south end-zone seats, increasing south end-zone capacity by 4,432 seats
               - Constructed a four-story office building to house all coaches, support staff and administration displaced by expanding east concourse
               - Added access points from behind the seating bowl and allow only players on the field - no ground-level track access
               - Eliminated lowest five rows of obstructed view seats
               - Expanded westside concourses to the sidewalk, adding more circulation space, concession stands and restrooms
               - Added a scoreboard, sound system and permanent lights for night games
               - Built an Athletic Operations Building/loading dock west of the UW Field House
                          Schedule            Phase 0 - December 2001 to August 2002               1. Athletic Operations Building                             2. Site utilities - new storm, water, sanitary and power             Phase 1 - December 2002 to August 2004                            1. Eastside superstructure - Camp Randall Suites, Varsity Club, Buckingham Club                             2. Athletic office building- Kellner Hall                             3. South end zone - visiting team locker room, media room                             4. Field replacement - FieldTurf on playing surface and McClain Facility                             5. Scoreboard replacement                             6. New stadium sound system                             7. Women's hockey rink replacement (in Shell)                             8. Stadium waterproofing and concrete restoration sections Q-X                             9. Eastside permanent field lights             Phase 2 - August 2004 to August 2005                            1. Remodel Westside level 3 concourse - Breese Terrace                             2. Remodel Westside press box;                                    Level 9: coaches, athletic department, Wisconsin club                                    Level 8: media level                                    Level 7: New radio and TV broadcast booths                             3. Remodel north end level 3 concourse                             4. Remodel eastside level 3 concourse                             5. Remodel eastside level 1 concourse - Badger Alley and team dining area                             6. Site work - new gates 1 to 10                             7. Stadium bowl remodel - back loading of stadium and balance of field replacement                             8. Stadium waterproofing and concrete restoration sections M-P                             9. Westside permanent field lights                            10. Bucky's Locker Room retail store - level 1 Kellner Hall            |